Skip to content
Bitcoin Mining Calculators Logo

Is the Antminer S21 XP+ Hyd profitable?

Bitmain · 2025 · Hydro-cooled · 480 TH/s · 5,280 W · 11 J/TH

Saved input sources

Based on network data from Oct 14, 2026, 06:15:04 UTC

Bitcoin price

$83,391 · Hourly price collection (saved snapshot)

Updated Oct 14, 2026, 06:15:04 UTC

Network difficulty

132.72 T · mempool.space (saved snapshot)

Updated Oct 14, 2026, 06:15:04 UTC

Block subsidy

3.125 BTC · Bitcoin protocol

Effective since Apr 20, 2024

Fee revenue per block

0.0177 BTC (7-day) · 0.0171 BTC (24-hour) · mempool.space reward stats (saved snapshot)

Updated Oct 14, 2026, 06:15:04 UTC

Network snapshot

Block 971,364 · 950.0 EH/s (difficulty-implied)

Hashrate derived from current difficulty via mempool.space (saved snapshot)

Yes. At $0.075/kWh, BTC at $83,391 and difficulty 132.72 T, the Antminer S21 XP+ Hyd nets about $9.00/day ($274/month). Simple payback on the $9,120 observed price is about 33.3 months.

Net profit / day
$9.00
$274 / month
Revenue / day
$18.31
21960 sats / day
Power / day
$9.31
$0.075/kWh
Simple payback
33.3 months
on $9,120
Shutdown BTC price
$42,414
today's difficulty
Shutdown after halving
$84,354
≈ Apr 2028 (estimated)
Break-even electricity
$0.147/kWh
today
Break-even after halving
$0.074/kWh
same price & difficulty

Profit by electricity price

ElectricityPower / dayNet profit / dayNet profit / monthSimple payback
$0.030/kWh$3.73$14.59$44420.6 months
$0.050/kWh$6.21$12.10$36824.8 months
$0.060/kWh$7.45$10.86$33027.6 months
$0.075/kWh$9.31$9.00$27433.3 months
$0.090/kWh$11.18$7.14$21742.0 months
$0.120/kWh$14.90$3.41$10487.9 months

Specifications and price

ManufacturerBitmain
Hashrate480 TH/s
Power5,280 W
Efficiency11 J/TH
CoolingHydro
Observed price$9,120 (manufacturer direct)
Price per TH$19.00/TH
Est. resale after 24 months$3,192
Status / channelNew · Manufacturer direct

Prices are point-in-time observations from September 24, 2026, not quotes.

Similar hydro-cooled machines

MachineTH/sJ/THPriceNet profit / day
SEALMINER A4 Pro Hydro68010.9$8,699$12.87
Antminer S23e U2H86510$11,699$17.74
Antminer S21j XP Hyd49512$8,415$8.41
Antminer S21 XP Hyd47312$6,899$8.03

Questions about the Antminer S21 XP+ Hyd

Is the Antminer S21 XP+ Hyd profitable?

Yes. At $0.075/kWh, BTC at $83,391 and difficulty 132.72 T, the Antminer S21 XP+ Hyd nets about $9.00/day ($274/month). Simple payback on the $9,120 observed price is about 33.3 months.

At what Bitcoin price should the Antminer S21 XP+ Hyd be turned off?

At $0.075/kWh it stops covering its power cost below about $42,414 per BTC at today's difficulty. After the next halving, ≈ Apr 2028 (estimated), that rises to about $84,354 at the same difficulty.

What electricity price does the Antminer S21 XP+ Hyd need to be profitable?

Below about $0.147/kWh at today's Bitcoin price and difficulty, falling to about $0.074/kWh after the halving.

How efficient is the Antminer S21 XP+ Hyd?

11 J/TH: 480 TH/s at 5,280 W, hydro-cooled, released 2025.

Assumptions: FPPS payout with the 7-day average transaction fees per block, 2% pool fee, 98% uptime, no facility overhead, taxes or financing. Post-halving figures halve the block subsidy at today's Bitcoin price and difficulty. These are snapshots, not forecasts.