Is the Antminer S21 XP Hyd profitable?
Bitmain · 2024 · Hydro-cooled · 473 TH/s · 5,676 W · 12 J/TH
Saved input sources
Based on network data from Oct 14, 2026, 06:15:04 UTC
Fee revenue per block
0.0177 BTC (7-day) · 0.0171 BTC (24-hour) · mempool.space reward stats (saved snapshot)
Updated Oct 14, 2026, 06:15:04 UTC
Network snapshot
Block 971,364 · 950.0 EH/s (difficulty-implied)
Hashrate derived from current difficulty via mempool.space (saved snapshot)
Yes. At $0.075/kWh, BTC at $83,391 and difficulty 132.72 T, the Antminer S21 XP Hyd nets about $8.03/day ($244/month). Simple payback on the $6,899 observed price is about 28.2 months.
Profit by electricity price
| Electricity | Power / day | Net profit / day | Net profit / month | Simple payback |
|---|---|---|---|---|
| $0.030/kWh | $4.00 | $14.04 | $427 | 16.2 months |
| $0.050/kWh | $6.67 | $11.37 | $346 | 19.9 months |
| $0.060/kWh | $8.01 | $10.04 | $305 | 22.6 months |
| $0.075/kWh | $10.01 | $8.03 | $244 | 28.2 months |
| $0.090/kWh | $12.01 | $6.03 | $183 | 37.6 months |
| $0.120/kWh | $16.02 | $2.03 | $62 | 112.0 months |
Specifications and price
| Manufacturer | Bitmain |
|---|---|
| Hashrate | 473 TH/s |
| Power | 5,676 W |
| Efficiency | 12 J/TH |
| Cooling | Hydro |
| Observed price | $6,899 (distributor new) |
| Price per TH | $14.59/TH |
| Est. resale after 24 months | $1,725 |
| Status / channel | New · Distributor |
Prices are point-in-time observations from September 24, 2026, not quotes.
Similar hydro-cooled machines
| Machine | TH/s | J/TH | Price | Net profit / day |
|---|---|---|---|---|
| Antminer S21j XP Hyd | 495 | 12 | $8,415 | $8.41 |
| SEALMINER A3 Pro Hydro | 660 | 12.5 | $9,900 | $10.63 |
| Antminer S21 XP+ Hyd | 480 | 11 | $9,120 | $9.00 |
| SEALMINER A4 Pro Hydro | 680 | 10.9 | $8,699 | $12.87 |
Questions about the Antminer S21 XP Hyd
Is the Antminer S21 XP Hyd profitable?
Yes. At $0.075/kWh, BTC at $83,391 and difficulty 132.72 T, the Antminer S21 XP Hyd nets about $8.03/day ($244/month). Simple payback on the $6,899 observed price is about 28.2 months.
At what Bitcoin price should the Antminer S21 XP Hyd be turned off?
At $0.075/kWh it stops covering its power cost below about $46,270 per BTC at today's difficulty. After the next halving, ≈ Apr 2028 (estimated), that rises to about $92,022 at the same difficulty.
What electricity price does the Antminer S21 XP Hyd need to be profitable?
Below about $0.135/kWh at today's Bitcoin price and difficulty, falling to about $0.068/kWh after the halving.
How efficient is the Antminer S21 XP Hyd?
12 J/TH: 473 TH/s at 5,676 W, hydro-cooled, released 2024.
Assumptions: FPPS payout with the 7-day average transaction fees per block, 2% pool fee, 98% uptime, no facility overhead, taxes or financing. Post-halving figures halve the block subsidy at today's Bitcoin price and difficulty. These are snapshots, not forecasts.
