Is the SEALMINER A2 Pro Hydro profitable?
Bitdeer · 2024 · Hydro-cooled · 500 TH/s · 7,450 W · 14.9 J/TH
Saved input sources
Based on network data from Oct 14, 2026, 06:15:04 UTC
Fee revenue per block
0.0177 BTC (7-day) · 0.0171 BTC (24-hour) · mempool.space reward stats (saved snapshot)
Updated Oct 14, 2026, 06:15:04 UTC
Network snapshot
Block 971,364 · 950.0 EH/s (difficulty-implied)
Hashrate derived from current difficulty via mempool.space (saved snapshot)
Yes. At $0.075/kWh, BTC at $83,391 and difficulty 132.72 T, the SEALMINER A2 Pro Hydro nets about $5.93/day ($180/month). Simple payback on the $6,500 observed price is about 36.0 months.
Profit by electricity price
| Electricity | Power / day | Net profit / day | Net profit / month | Simple payback |
|---|---|---|---|---|
| $0.030/kWh | $5.26 | $13.82 | $420 | 15.5 months |
| $0.050/kWh | $8.76 | $10.31 | $314 | 20.7 months |
| $0.060/kWh | $10.51 | $8.56 | $260 | 25.0 months |
| $0.075/kWh | $13.14 | $5.93 | $180 | 36.0 months |
| $0.090/kWh | $15.77 | $3.31 | $101 | 64.7 months |
| $0.120/kWh | $21.03 | −$1.95 | −$59 | No payback |
Specifications and price
| Manufacturer | Bitdeer |
|---|---|
| Hashrate | 500 TH/s |
| Power | 7,450 W |
| Efficiency | 14.9 J/TH |
| Cooling | Hydro |
| Observed price | $6,500 (manufacturer direct) |
| Price per TH | $13.00/TH |
| Est. resale after 24 months | $1,625 |
| Status / channel | New · Manufacturer direct |
Prices are point-in-time observations from September 24, 2026, not quotes.
Similar hydro-cooled machines
| Machine | TH/s | J/TH | Price | Net profit / day |
|---|---|---|---|---|
| WhatsMiner M73 | 512 | 14.5 | $6,144 | $6.44 |
| WhatsMiner M63S++ | 464 | 15.5 | $4,640 | $5.02 |
| Teraflux AH3880 (Eco) | 400 | 14.3 | $5,200 | $5.17 |
| Avalon A1566HA 500T | 500 | 16.13 | $4,000 | $4.85 |
Questions about the SEALMINER A2 Pro Hydro
Is the SEALMINER A2 Pro Hydro profitable?
Yes. At $0.075/kWh, BTC at $83,391 and difficulty 132.72 T, the SEALMINER A2 Pro Hydro nets about $5.93/day ($180/month). Simple payback on the $6,500 observed price is about 36.0 months.
At what Bitcoin price should the SEALMINER A2 Pro Hydro be turned off?
At $0.075/kWh it stops covering its power cost below about $57,452 per BTC at today's difficulty. After the next halving, ≈ Apr 2028 (estimated), that rises to about $114,261 at the same difficulty.
What electricity price does the SEALMINER A2 Pro Hydro need to be profitable?
Below about $0.109/kWh at today's Bitcoin price and difficulty, falling to about $0.055/kWh after the halving.
How efficient is the SEALMINER A2 Pro Hydro?
14.9 J/TH: 500 TH/s at 7,450 W, hydro-cooled, released 2024.
Assumptions: FPPS payout with the 7-day average transaction fees per block, 2% pool fee, 98% uptime, no facility overhead, taxes or financing. Post-halving figures halve the block subsidy at today's Bitcoin price and difficulty. These are snapshots, not forecasts.
