Is the Antminer S23 XP Hyd profitable?
Bitmain · 2026 · Hydro-cooled · 600 TH/s · 5,340 W · 8.9 J/TH
Saved input sources
Based on network data from Oct 14, 2026, 06:15:04 UTC
Fee revenue per block
0.0177 BTC (7-day) · 0.0171 BTC (24-hour) · mempool.space reward stats (saved snapshot)
Updated Oct 14, 2026, 06:15:04 UTC
Network snapshot
Block 971,364 · 950.0 EH/s (difficulty-implied)
Hashrate derived from current difficulty via mempool.space (saved snapshot)
Yes. At $0.075/kWh, BTC at $83,391 and difficulty 132.72 T, the Antminer S23 XP Hyd nets about $13.47/day ($410/month). Simple payback on the $15,300 observed price is about 37.3 months.
Profit by electricity price
| Electricity | Power / day | Net profit / day | Net profit / month | Simple payback |
|---|---|---|---|---|
| $0.030/kWh | $3.77 | $19.12 | $582 | 26.3 months |
| $0.050/kWh | $6.28 | $16.61 | $505 | 30.3 months |
| $0.060/kWh | $7.54 | $15.35 | $467 | 32.8 months |
| $0.075/kWh | $9.42 | $13.47 | $410 | 37.3 months |
| $0.090/kWh | $11.30 | $11.59 | $352 | 43.4 months |
| $0.120/kWh | $15.07 | $7.82 | $238 | 64.3 months |
Specifications and price
| Manufacturer | Bitmain |
|---|---|
| Hashrate | 600 TH/s |
| Power | 5,340 W |
| Efficiency | 8.9 J/TH |
| Cooling | Hydro |
| Observed price | $15,300 (manufacturer direct) |
| Price per TH | $25.50/TH |
| Est. resale after 24 months | $5,355 |
| Status / channel | Futures · Manufacturer direct |
Prices are point-in-time observations from September 24, 2026, not quotes.
Similar hydro-cooled machines
| Machine | TH/s | J/TH | Price | Net profit / day |
|---|---|---|---|---|
| SEALMINER A4 Ultra Hydro | 886 | 9.45 | $9,999 | $19.03 |
| Antminer S23 Hyd | 580 | 9.5 | $14,299 | $12.41 |
| Antminer S23e U2H | 865 | 10 | $11,699 | $17.74 |
| SEALMINER A4 Pro Hydro | 680 | 10.9 | $8,699 | $12.87 |
Questions about the Antminer S23 XP Hyd
Is the Antminer S23 XP Hyd profitable?
Yes. At $0.075/kWh, BTC at $83,391 and difficulty 132.72 T, the Antminer S23 XP Hyd nets about $13.47/day ($410/month). Simple payback on the $15,300 observed price is about 37.3 months.
At what Bitcoin price should the Antminer S23 XP Hyd be turned off?
At $0.075/kWh it stops covering its power cost below about $34,317 per BTC at today's difficulty. After the next halving, ≈ Apr 2028 (estimated), that rises to about $68,250 at the same difficulty.
What electricity price does the Antminer S23 XP Hyd need to be profitable?
Below about $0.182/kWh at today's Bitcoin price and difficulty, falling to about $0.092/kWh after the halving.
How efficient is the Antminer S23 XP Hyd?
8.9 J/TH: 600 TH/s at 5,340 W, hydro-cooled, released 2026.
Assumptions: FPPS payout with the 7-day average transaction fees per block, 2% pool fee, 98% uptime, no facility overhead, taxes or financing. Post-halving figures halve the block subsidy at today's Bitcoin price and difficulty. These are snapshots, not forecasts.
