Is the Antminer S19 XP Hydro 257T profitable?
Bitmain · 2022 · Hydro-cooled · 257 TH/s · 5,346 W · 20.8 J/TH
Saved input sources
Based on network data from Oct 14, 2026, 06:15:04 UTC
Fee revenue per block
0.0177 BTC (7-day) · 0.0171 BTC (24-hour) · mempool.space reward stats (saved snapshot)
Updated Oct 14, 2026, 06:15:04 UTC
Network snapshot
Block 971,364 · 950.0 EH/s (difficulty-implied)
Hashrate derived from current difficulty via mempool.space (saved snapshot)
Yes. At $0.075/kWh, BTC at $83,391 and difficulty 132.72 T, the Antminer S19 XP Hydro 257T nets about $0.37/day ($11/month). Simple payback on the $771 observed price is about 67.7 months.
Profit by electricity price
| Electricity | Power / day | Net profit / day | Net profit / month | Simple payback |
|---|---|---|---|---|
| $0.030/kWh | $3.77 | $6.03 | $183 | 4.2 months |
| $0.050/kWh | $6.29 | $3.52 | $107 | 7.2 months |
| $0.060/kWh | $7.54 | $2.26 | $69 | 11.2 months |
| $0.075/kWh | $9.43 | $0.37 | $11 | 67.7 months |
| $0.090/kWh | $11.32 | −$1.51 | −$46 | No payback |
| $0.120/kWh | $15.09 | −$5.28 | −$161 | No payback |
Specifications and price
| Manufacturer | Bitmain |
|---|---|
| Hashrate | 257 TH/s |
| Power | 5,346 W |
| Efficiency | 20.8 J/TH |
| Cooling | Hydro |
| Observed price | $771 (distributor used) |
| Price per TH | $3.00/TH |
| Est. resale after 24 months | $386 |
| Status / channel | Used · Distributor |
Prices are point-in-time observations from September 24, 2026, not quotes.
Similar hydro-cooled machines
| Machine | TH/s | J/TH | Price | Net profit / day |
|---|---|---|---|---|
| WhatsMiner M63 | 372 | 19.9 | $2,976 | $1.13 |
| WhatsMiner M63S | 408 | 18 | $3,672 | $2.61 |
| Avalon A1566HA 460T | 460 | 17.83 | $3,220 | $3.08 |
| Avalon A1566HA 500T | 500 | 16.13 | $4,000 | $4.85 |
Questions about the Antminer S19 XP Hydro 257T
Is the Antminer S19 XP Hydro 257T profitable?
Yes. At $0.075/kWh, BTC at $83,391 and difficulty 132.72 T, the Antminer S19 XP Hydro 257T nets about $0.37/day ($11/month). Simple payback on the $771 observed price is about 67.7 months.
At what Bitcoin price should the Antminer S19 XP Hydro 257T be turned off?
At $0.075/kWh it stops covering its power cost below about $80,207 per BTC at today's difficulty. After the next halving, ≈ Apr 2028 (estimated), that rises to about $159,517 at the same difficulty.
What electricity price does the Antminer S19 XP Hydro 257T need to be profitable?
Below about $0.078/kWh at today's Bitcoin price and difficulty, falling to about $0.039/kWh after the halving.
How efficient is the Antminer S19 XP Hydro 257T?
20.8 J/TH: 257 TH/s at 5,346 W, hydro-cooled, released 2022.
Assumptions: FPPS payout with the 7-day average transaction fees per block, 2% pool fee, 98% uptime, no facility overhead, taxes or financing. Post-halving figures halve the block subsidy at today's Bitcoin price and difficulty. These are snapshots, not forecasts.
